01

Separate positions and configurations

A conveyor may use different rollers on the carrying run, return run or loading area. Give each distinct position or configuration its own schedule line. If two positions share a part number, show both positions and quantities clearly rather than combining them in a way that hides the installation location.

02

Identify the controlling reference

For every line, record the part number if available, drawing number and revision. State whether the reference is an approved drawing, a prior order or a sample measurement. If documents conflict, flag the difference for confirmation instead of silently choosing one.

03

Keep dimensions tied to the drawing

List the dimensions shown on the applicable drawing, such as tube outside diameter, shaft details and mounting or overall length where specified. Use the same labels as the drawing and keep tolerances with their dimensions. The selection guide can help with initial reference ranges, but a listed range does not confirm that every combination is available or suitable.

For shaft-end shapes and length definitions, see the roller replacement preparation guide.

04

Make quantity and supply scope explicit

Give a quantity for each configuration and revision. Say whether the request covers loose rollers, a roller set with frame, or additional bearing and seal components. If hardware is included, identify it separately so the quotation and package contents can be checked against the same list.

05

Add application context for review

Where available, provide belt width, roller position and a short description of conveyed material and operating conditions. These details give the supplier context for a technical review; they do not replace a drawing or create an assumed load rating. If operating values are unknown, mark them as not confirmed.

06

Use a schedule that is easy to confirm

PositionPart / drawing and revisionDimensions referenceQuantitySupply scope / notes
ReturnEnter referenceSee attached drawingEnter quantityState loose roller or assembly
CarryingEnter referenceSee attached drawingEnter quantityState loose roller or assembly
Other positionEnter referenceSee attached drawingEnter quantityIdentify any open questions

Attach the drawings and identify the delivery destination. Before order confirmation, reconcile the quotation line by line with the final approved references and agreed scope.

See the return roller schedule fields →Discuss a roller inquiry →Selection manuals →